Welcome To UJVNL Data Center
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DISCHARGE MEASUREMENT SYSTEM FOR UJVNL
- NALUNNA BRIDGE
- HEENA BRIDGE
- JOSHIYARA BRIDGE
- MANERA BRIDGE
- ASAN BARRAGE
- Real Time Discharge at Naluna Bridge (InflowFlow From Maneri Dam in Cumec)
- Real TIme Discharge at Heena Bridge (OutFlow from Maneri Dam in Cumec)
- Real Time Discharge at Joshiyara Bridge (InflowFlow From Joshiyara Barrage in Cumec)
- Real Time Discharge at Manera Bridge (OutFlow From Joshiyara Barrage in Cumec)
- DAM REHABILITATION AND IMPROVEMENT PROJECT
Site : NALUNNA BRIDGE
River : BHAGIRATHI
District : UTTARKASHI
Date : 11/20/2023
Time : 12:15
Water Level(mtr):1400.560
Battery Voltage(volts):13.270
Velocity(mtr/sec):1.260
Discharge(cumecs):36.390
Site : HEENA BRIDGE
River : BHAGIRATHI
District : UTTARKASHI
Date : 11/20/2023
Time : 12:12
Water Level(mtr):1235.790
Battery Voltage(volts):13.040
Velocity(mtr/sec):0.780
Discharge(cumecs):10.620
Site : JOSHIYARA BRIDGE
River : BHAGIRATHI
District : UTTARKASHI
Date : 12/7/2023
Time : 10:30
Water Level(mtr):1107.320
Battery Voltage(volts):13.030
Velocity(mtr/sec):1.160
Discharge(cumecs):6.130
Site : MANERA BRIDGE
River : BHAGIRATHI
District : UTTARKASHI
Date : 11/20/2023
Time : 12:0
Water Level(mtr):1066.560
Battery Voltage(volts):12.960
Velocity(mtr/sec):0.730
Discharge(cumecs):6.890
Site : ASAN BARRAGE
River : ASAN RIVER
District : DEHRADUN
Date : 9/19/2025
Time : 15:12
Water Level(mtr):0.000
Battery Voltage(volts):0.000
Velocity(mtr/sec):0.000
Discharge(cumecs):0.000
Copyright © 2022 RK Engineering Corporation, All rights reserved.
Developed by RK Engineering Corporation